Agenda item

FUL/2022/0353 - Land off Claremont Street, Burnley, Lancashire

Minutes:

Town and Country Planning Act 1990

 

Erection of 7no. new dwellings

 

Land Off Claremont Street Burnley, Lancashire, BB12 0HG.

 

Decision

 

That the application be approved subject to the following conditions.

 

Conditions and reasons

 

1.         The development hereby permitted shall be begun before the expiration of three years from the date of this permission.

 

Reason: Required to be imposed by Section 91 of the Town and Country Planning Act 1990, as amended by Section 51 of the Planning and Compulsory Purchase Act 2004

 

2.         The development hereby permitted shall be carried out in accordance with the following approved plans: location plan 001, proposed plans and elevations 026 Rev Cn and 027, site section 024 Rev A and proposed block plan 025 C unless otherwise agreed in writing by the local planning authority.

 

Reason: To ensure the development is implemented in accordance with the approved plans and to avoid ambiguity

           

3.       All materials to be used in the approved scheme shall be as stated on the approved drawings received and shall not be varied without the prior written approval of the Local Planning authority.

 

            Reason: To ensure that the development will be of a satisfactory appearance and to comply with policies SP5 and HS5 of Burnley's Local Plan 2018.

 

Highways

 

4.         No development shall take place, including any works of demolition or site clearance, until a Construction Management Plan (CMP) or Construction Method Statement (CMS) has been submitted to, and approved in writing by the local planning authority. The approved plan / statement shall provide:

  • 24 Hour emergency contact number.
  • Details of the parking of vehicles of site operatives and visitors.
  • Details of loading and unloading of plant and materials.
  • Measures to protect vulnerable road users (pedestrians and cyclists).
  • The erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate.
  • Wheel washing facilities.
  • Measures to deal with dirt, debris, mud or loose material deposited on the highway as a result of construction.
  • Measures to control the emission of dust and dirt during construction.
  • Details of a scheme for recycling/disposing of waste resulting from

demolition and construction works.

  • Delivery, demolition and construction working hours.

The approved Construction Management Plan or Construction Method Statement shall be adhered to throughout the construction period for the development. Reason: - In the interests of the safe operation of the adopted highway during the demolition and construction phases.

Note: Construction Management Plan.

  • There must be no storage of materials in the public highway at any time.
  • There must be no standing or waiting of machinery or vehicles in the public highway at any time.
  • There must be no machinery operating over the highway at any time, this includes reference to loading/unloading operations – all of which must be managed within the confines of the site.
  • A licence to erect hoardings adjacent to the highway (should they be

proposed) may be required. If necessary this can be obtained via the County Council (as the Highway Authority) by contacting the Council by telephoning 01772 533433 or e-mailing lhsstreetworks@lancashire.gov.uk.

 

Reason: In the interests of highway safety in accordance with policies IC3 and SP5 of Burnley’s adopted Local Plan (July 2018)

 

5.         The surface water from the approved driveway/hardstanding/car park should be collected within the site and drained to a suitable internal outfall. Prior to commencement of the development details of the drainage strategy shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall be implemented in accordance with the approved details.

Reason: In the interest of highway safety to prevent water from discharging onto the public highway.

 

6.         No dwelling shall be occupied until the car parking area has been surfaced or paved in accordance with a scheme to be approved by the Local Planning Authority and the car parking spaces and manoeuvring areas marked out in accordance with the approved plan. The car parking area shall thereafter be kept free of obstruction and available for the parking cars at all times.

Reason: To allow for the effective use of the parking areas.

 

7.         No dwelling shall be occupied until drop kerbs have been installed at the carriageway edge and a vehicle cross-over constructed across the footway fronting the site in accordance with the approved plans and the Lancashire County Council Specification for Construction of Estate Roads, to be retained in that form thereafter for the lifetime of the development.

            Reason: In the interests of pedestrian safety and accessibility.

 

8.         The development hereby permitted shall not be occupied until an electric vehicle charging point has been installed, 1 per property and shall thereafter be maintained

 

            Reason: To support sustainable transport objectives and to contribute to areduction in harmful vehicle emissions.

 

Environmental Health

9.         No construction work shall take place on the development hereby approved outside the hours of 8am to 6pm Monday to Friday, 8am to 1pm on Saturday and not at any time on Sundays and Bank Holidays. Where permission is sought for works to be carried out outside the hours stated, applications in writing must be made with at least seven days’ notice to the Local Planning Authority.

There shall be no burning of construction-derived waste or other materials within the curtilage of the premises.

Reason: to ensure there is no unacceptable adverse impact on the amenity of neighbouring occupants or adjacent land users in accordance with Policy SP5 of Burnley`s Local Plan.

 

10        Prior to commencement of the development hereby approved, the following components of a scheme to deal with the risks associated with contamination of the site shall each be submitted to and approved in writing by the Local Planning Authority:

 

1. A Preliminary Risk Assessment which has identified: all previous (historical) uses; potential contaminants associated with those uses; a conceptual model of the site indicating sources, pathways and receptors; potentially unacceptable risks arising from contamination at the site.

 

2. A Site Investigation Scheme, based on (1) above to provide information for a detailed assessment of the risk to all receptors that may be affected, including those off site.

 

3. Based on the Site Investigation Scheme and the detailed risk assessment (2), an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken.

 

4. A Verification Report providing details of the data that will be collected in order to demonstrate that the works set out in (3) are complete and identifying any requirements for longer-term monitoring of pollutant linkages, maintenance and arrangements for contingency action.

 

Note:  Any changes to these components, (1) to (4) require the express written consent of the Local Planning Authority.

 

The scheme shall be implemented as approved above and, prior to commencement of any construction work (or such other date or stage in development as may be agreed in writing with the Local Planning Authority), a Verification Report demonstrating completion of the works set out in the approved remediation strategy and the effectiveness of that remediation shall be submitted to and approved in writing by the Local Planning Authority. The report shall include results of sampling and monitoring carried out in accordance with the approved verification plan to demonstrate that the site remediation criteria have been met. The report shall also include a long-term monitoring and maintenance plan for longer-term monitoring of pollutant linkages, maintenance and arrangements for contingency action, as identified in the verification report, and for the reporting of this in writing to the Local Planning Authority.

 

Reason: To ensure that risks from contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecology systems, to ensure that the development can be carried out safely without unaccpetable risks to workers, neighbours and other off-site receptors, in accordance with policy NE5 of Burnley’s adoped Local Plan.

Drainage

11.       Prior to the commencement of development the applicant shall submit a plan outlining the proposed levels (including finished floor levels and ground levels) shown in metres above Ordnance Datum and an indicative foul and surface water drainage strategy (including cover and invert levels). The applicant should note that it may be necessary to raise finished floor and ground levels and / or include mitigation measures to manage the risk of sewer surcharge.

 

Reason: To promote sustainable development, secure proper drainage and to manage the risk of flooding and pollution in accordance with policy CC5 of Burnley’s Local Plan

 

12.       Prior to the commencement of development, details of a sustainable surface water drainage scheme and a foul water drainage scheme shall be submitted to and approved in writing by the Local Planning Authority. The drainage schemes must include:

(i) An investigation of the hierarchy of drainage options in the National Planning Practice Guidance (or any subsequent amendment thereof). This investigation shall include evidence of an assessment of ground conditions and the potential for infiltration of surface water in accordance with BRE365;

(ii) A restricted rate of discharge of surface water agreed with the local planning authority (if it is agreed that infiltration is discounted by the investigations);
(iii) Levels of the proposed drainage systems including proposed ground and finished floor levels in AOD;

(iv) Incorporate mitigation measures to manage the risk of sewer surcharge where applicable; and

(v) Foul and surface water shall drain on separate systems.

The approved schemes shall also be in accordance with the Non-Statutory Technical Standards for Sustainable Drainage Systems (March 2015) or any subsequent replacement national standards.

Prior to occupation of the proposed development, the drainage schemes shall be completed in accordance with the approved details and retained thereafter for the lifetime of the development.

Reason: To promote sustainable development, secure proper drainage and to manage the risk of flooding and pollution in accordance with policy CC5 of Burnley’s Local Plan

 

Notes

Informative Note:

• This consent requires the construction of a vehicle access to the public highway. Under the Highways Act 1980 Section 171 Lancashire County Council as the Highway Authority must specify the works to be carried out. Only a contractor approved by the Highway Authority can carry out these works. Therefore, before any works can start, the applicant must contact the Highway Authority at highways@lancashire.gov.uk to ascertain the details of such an agreement. More information can be found on Lancashire County Council’s website at http://www.lancashire.gov.uk/roads-parking-and- travel/roads/vehicle-crossings.aspx

Coal Authority standing advice

 